The global and independent platform for the SAP community.

Easily leverage Hana HA cluster functionality

IT managers cannot avoid using cluster management software to secure Hana High Availability (HA). The automation provided increases SLAs, and also simplifies cluster usage in general.
Friedrich Krey, Suse
October 1, 2016
Penguin on the TVs with inscription "Linux
avatar
This text has been automatically translated from German to English.

Without a solid grounding in IT infrastructure or operations issues, Hana projects stand on feet of clay.

Companies must ensure that business-critical SAP applications such as S/4 or BW/4 Hana can be used at virtually any time. After all, business continuity must neither falter for a long time nor lie completely idle.

On the IT infrastructure/Hana agenda, the topic complex of High Availability (HA) is still at the top and, incidentally, is discussed in one way or another at practically every Suse SAP workshop, for example.

As in previous versions, the current version 12 of Suse Linux Enterprise (SLES) for SAP Applications provides SAP Suse customers with the High Availability Extension (HAE) including disaster recovery (DR) functionality from the outset. Usable for both Any DB and Hana DB deployment.

Important here:

The High Availability Extension in SLES for SAP Applications is a complete HA open source solution package available to SAP Suse customers for use free of charge.

This eliminates the need to spend additional money on an additional cluster resource management solution for Hana deployments.

Incidentally, Suse HAE for SAP Applications is based on the open source solution Pacemaker.

Of course, the Suse HA solution is integrated into the SAP system management (Solution Manager) just like the operating system platform Suse Linux Enterprise Server for SAP Applications.

At the heart of SAP's Hana HA concept is Hana System Replication (SR). However, the handling/usage is usually done manually.

Of course, there are advantages to SR automation, which can result in an increase in SLAs.

A Hana system replication runs via a memory preload in a cluster (in minimum 2-node cluster). In the event of a failure, automatic switchover takes place using Suse HAE for SAP Applications.

Disaster Recovery

In case of a necessary disaster recovery scenario, it is possible that a Hana System Replication is performed by an additional asynchronous replication to another site (e.g. another Data Center) to achieve DR coverage.

There is also a "cost-optimized approach". Here, a memory preload (on a system constantly running in parallel) is dispensed with. A second node is also used here.

However, it acts mainly as a test and development system, and Hana System Replication is run or used on the second node exclusively in the HA case.

Compared to a high-availability environment with synchronous memory preload, Hana recovery naturally takes longer here.

Nevertheless, this approach means a beneficial minimization of investment/operating costs. In a possible DR scenario, replication to the secondary site is also asynchronous again.

Based on Hana Resource Agents (RA) from Suse, Hana database instances and replications can be administered and managed.

These resource agents also enable intelligent and at the same time simplified use of cluster configurations. And much easier than was the case in the past.

Conclusion

In summary, the Suse High Availability Extension (HAE) provided with SLES for SAP Applications has been a proven and leading high availability solution for improving business continuity/high availability including disaster recovery functionality for SAP solutions for years now.

Together with SAP, it was optimized for Hana use through additional developments.

It increases the SLAs for Hana operation, simplifies the handling of cluster configurations and can be used for both scale-up and scale-out system environments. Whereby there is a "controlled Availability" (cA) for the scale-out deployment.

https://e3mag.com/partners/suse-linux-gmbh/

avatar
Friedrich Krey, Suse

Friedrich Krey is Head of SAP Alliances and Partners EMEA Central SUSE Linux GmbH and one of our esteemed E3 SAP Community Magazine columnists.


Write a comment

Working on the SAP basis is crucial for successful S/4 conversion. 

This gives the Competence Center strategic importance for existing SAP customers. Regardless of the S/4 Hana operating model, topics such as Automation, Monitoring, Security, Application Lifecycle Management and Data Management the basis for S/4 operations.

For the second time, E3 magazine is organizing a summit for the SAP community in Salzburg to provide comprehensive information on all aspects of S/4 Hana groundwork.

Venue

More information will follow shortly.

Event date

Wednesday, May 21, and
Thursday, May 22, 2025

Early Bird Ticket

Available until Friday, January 24, 2025
EUR 390 excl. VAT

Regular ticket

EUR 590 excl. VAT

Venue

Hotel Hilton Heidelberg
Kurfürstenanlage 1
D-69115 Heidelberg

Event date

Wednesday, March 5, and
Thursday, March 6, 2025

Tickets

Regular ticket
EUR 590 excl. VAT
Early Bird Ticket

Available until December 24, 2024

EUR 390 excl. VAT
The event is organized by the E3 magazine of the publishing house B4Bmedia.net AG. The presentations will be accompanied by an exhibition of selected SAP partners. The ticket price includes attendance at all presentations of the Steampunk and BTP Summit 2025, a visit to the exhibition area, participation in the evening event and catering during the official program. The lecture program and the list of exhibitors and sponsors (SAP partners) will be published on this website in due course.