{"id":244,"date":"2013-08-05T10:19:42","date_gmt":"2013-08-05T08:19:42","guid":{"rendered":"http:\/\/e3mag.com\/?p=244"},"modified":"2019-04-01T10:57:06","modified_gmt":"2019-04-01T08:57:06","slug":"biss-to-the-locomotive","status":"publish","type":"post","link":"https:\/\/e3mag.com\/en\/biss-zur-lokomotive\/","title":{"rendered":"Up(s) to the locomotive"},"content":{"rendered":"<p>Single-unit and small-batch manufacturers in the mechanical engineering sector usually produce complex products with customized features. Production is usually project-related, with customer-specific variants often being developed.<\/p>\n<p>Due to the numerous <span id=\"urn:local-text-annotation-iyt4qzhxs3qe1e783vsecskweo90suuk\" class=\"textannotation disambiguated wl-thing\">Components<\/span> is the timely <span id=\"urn:local-text-annotation-6txlkwpnnhhslkjhbnwiz0sh583c3db3\" class=\"textannotation disambiguated wl-thing\">Production<\/span> a challenge for the <span id=\"urn:local-text-annotation-ve5bwwwwyefufujv6lprikp59ctinlpk\" class=\"textannotation disambiguated wl-thing\">Production planning and control<\/span>. With the <span id=\"urn:local-text-annotation-32ldpkn4pfoi0pkrha3u0i5jvdd7k87a\" class=\"textannotation disambiguated wl-thing\">SAP ERP<\/span>-Module <span id=\"urn:local-text-annotation-j5qavowqbp9w464i58nmpkrr2dde7ar1\" class=\"textannotation disambiguated wl-thing\">PS<\/span> a tool is available with which the large quantity structure can be structured and mapped.<\/p><div id=\"great-1471948950\" class=\"great-fullsize-content-en great-entity-placement\" style=\"margin-bottom: 20px;\"><a data-no-instant=\"1\" href=\"https:\/\/www.youtube.com\/watch?v=6ZGXMPyM-nU\" rel=\"noopener\" class=\"a2t-link\" target=\"_blank\" aria-label=\"banner_26-04_29_1200x150\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1.jpg\" alt=\"\"  srcset=\"https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1.jpg 1200w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-400x50.jpg 400w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-768x96.jpg 768w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-100x13.jpg 100w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-480x60.jpg 480w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-640x80.jpg 640w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-720x90.jpg 720w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-960x120.jpg 960w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-1168x146.jpg 1168w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-18x2.jpg 18w, https:\/\/e3mag.com\/wp-content\/uploads\/2026\/03\/banner_26-04_29_1200x150-1-600x75.jpg 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" width=\"1200\" height=\"150\"  style=\" max-width: 100%; height: auto;\" \/><\/a><\/div>\n<p>Since this system is transaction-oriented, it quickly and clearly presents information about individual <span id=\"urn:local-text-annotation-co1mdiczkfihg5cdzq67c1giogrx8ozx\" class=\"textannotation disambiguated wl-thing\">Components<\/span> ready. It is just as suitable for accompanying and documenting production.<\/p>\n<p>Since the module <span id=\"urn:local-text-annotation-9ajn2eab5cpwfseptvk42pw7fxopd119\" class=\"textannotation disambiguated wl-thing\">PS<\/span> but only a few functions for gaining an overview and <span id=\"urn:local-text-annotation-lx3n5tp4vy8ta3dnxd6nk3j5n05uty6v\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> is possible through the replacement of a common <span id=\"urn:local-text-annotation-u1zmafuinnex46nv7k4kfh7rxvf2qgtg\" class=\"textannotation disambiguated wl-thing\">Database<\/span> with a faster <span id=\"urn:local-text-annotation-471xqcpy7u7ckhftzvfn1dqp738pms5b\" class=\"textannotation disambiguated wl-thing\">Database<\/span> alone, no improvement can be expected.<\/p>\n<p>Discussed is the manufacture of <span id=\"urn:local-text-annotation-nrll7bdel25ji3zwnlc8v8u62h3s73i6\" class=\"textannotation disambiguated wl-thing\">Diesel locomotives<\/span>, mainly for shunting operations. Such a <span id=\"urn:local-text-annotation-7817k4bua8ry469tzcu81x5uoe2qvqac\" class=\"textannotation disambiguated wl-thing\">Locomotive<\/span> consists of 25,000 to 30,000 individual parts.<\/p>\n<p>This <span id=\"urn:local-text-annotation-fq5ir7we86jw4qcvqn5dkmertfwzkfvi\" class=\"textannotation disambiguated wl-thing\">Locomotives<\/span> are offered in various basic types and then modified to a greater or lesser extent according to specific customer requirements. Considering that the annual output comprises more than 55 machines, one can easily get an idea of the quantity structure to be processed.<\/p>\n<p>The <span id=\"urn:local-text-annotation-rd0xcnuo8z4p2waw3aw391xnwk2tsbim\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> of the customer-specific characteristics of complex technical products can be achieved using the <span id=\"urn:local-text-annotation-60h6ujgyrnw8v0lxdq53pnh6ucduk1dq\" class=\"textannotation disambiguated wl-thing\">ERP<\/span>-<span id=\"urn:local-text-annotation-akhsbegcrb5u32bjv5wt48h462mxgu5s\" class=\"textannotation disambiguated wl-thing\">PS<\/span>-Module from <span id=\"urn:local-text-annotation-eywxfrncs0oslmmwfj8cffu1sq7yj3my\" class=\"textannotation disambiguated wl-organization\">SAP<\/span> for make-to-order production and the <span id=\"urn:local-text-annotation-8867he7urkl9f47lhd12e72p3zuamwc8\" class=\"textannotation disambiguated wl-thing\">Small series<\/span> well. The main production steps - in this example, the main assemblies - are mapped in networks.<\/p>\n<p>Bills of material are assigned to these networks at the individual network activities. These BOMs can contain both purchased parts and anonymously produced standard assemblies. The standard assemblies can be broken down further over several production levels.<\/p>\n<p>Thus, there is a mixture of customer-oriented and customer-anonymous production.<\/p>\n<p>At <span id=\"urn:local-text-annotation-ft656fw2w65r4ff601u4xbs2x6uw8a65\" class=\"textannotation disambiguated wl-thing\">Frame<\/span> A customer is given a delivery date for a product on the basis of coarsened capacity estimates. <span id=\"urn:local-text-annotation-iashmhk1t1awfyp6tqryje5bdipq06zb\" class=\"textannotation disambiguated wl-thing\">Locomotive<\/span> notified. This estimate is made on the basis of <span id=\"urn:local-text-annotation-yx3rq4zo90lxrnxqcac9qctl2dgworaz\" class=\"textannotation disambiguated wl-thing\">Data<\/span> for standardized prototype locomotives and coarsened capacity requirements outside the <span id=\"urn:local-text-annotation-pczqr0c0qir3pxcvorzjygem7hov1wkm\" class=\"textannotation disambiguated wl-organization\">SAP<\/span>-System.<\/p>\n<p>The challenge now is to transform this coarse into a fine <span id=\"urn:local-text-annotation-0vsv2bpbm2xl3eiimrz7j5l6ho6au6o5\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> to transfer. On the one hand, this naturally concerns the scheduling of the production steps of a <span id=\"urn:local-text-annotation-bqdz3v2vwz6yvl72sdfh8n6y756wtwl0\" class=\"textannotation disambiguated wl-thing\">Locomotive<\/span>. It is complicated by the fact that during manufacturing several <span id=\"urn:local-text-annotation-v0zjy1mdbij2o765022chten3qs56cnm\" class=\"textannotation disambiguated wl-thing\">Locomotives<\/span> compete for the same capacities and materials.<\/p>\n<p>The difficulty does not usually arise during final assembly, as this is not carried out until all the <span id=\"urn:local-text-annotation-eyrewgmsec7ifdiru5x2x7s1hmi8ahik\" class=\"textannotation disambiguated wl-thing\">Components<\/span> are available. The problem rather lies in the coordination and <span id=\"urn:local-text-annotation-70syduosnxdgeirzb2hjtsm2n3op498c\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> of customer-anonymous manufacturing.<\/p>\n<p>A single component or assembly can be manufactured in multiple <span id=\"urn:local-text-annotation-gqjoj3wrz7snemn22uk1wltnj5htn786\" class=\"textannotation disambiguated wl-thing\">Locomotives<\/span> be obstructed. Here, for reasons of economic <span id=\"urn:local-text-annotation-hoycuwjn35fjz3ufnaej6yalpkf1svzn\" class=\"textannotation disambiguated wl-thing\">Warehousing<\/span> the principle of \"first come - first served\" is applied.<\/p>\n<p>If you were to work with order reservations, it would be easier to assign an assembly to a certain order. <span id=\"urn:local-text-annotation-3587pz3x1vnty87z4zbrgbx2x1s03y35\" class=\"textannotation disambiguated wl-thing\">Locomotive<\/span>but this would also have a correspondingly higher <span id=\"urn:local-text-annotation-ky461nudicftg004vw7hr5pg966fth8x\" class=\"textannotation disambiguated wl-thing\">Stock<\/span> as a result.<\/p>\n<p>In practice, one usually helps oneself by referring to individual <span id=\"urn:local-text-annotation-vlqzus1rbnxt939wf4jtc59o8tu3lwas\" class=\"textannotation disambiguated wl-thing\">Locomotives<\/span> the so-called backlog hours are determined. The backlog hours are calculated by means of <span id=\"urn:local-text-annotation-l8h5pgq036c0w8mcwewxamk6ktwyvxb9\" class=\"textannotation disambiguated wl-organization\">SAP<\/span> calculated.<\/p>\n<p>With the help of this information, priorities are then set in production when deadlines are tight in order to meet the production dates promised to customers. However, this is not <span id=\"urn:local-text-annotation-3xl3aofp1srqbepsbnvxbxochc3dulsg\" class=\"textannotation disambiguated wl-thing\">Planning<\/span>but reactive control.<\/p>\n<p>Therefore, in this context, users want a dynamic <span id=\"urn:local-text-annotation-nun2l0kaursu5j9ogjblpclg3arfpy3s\" class=\"textannotation disambiguated wl-thing\">Pegging<\/span> and a simultaneous <span id=\"urn:local-text-annotation-wn0az9qpgaqfvr2fmjhi687y4d76prfw\" class=\"textannotation disambiguated wl-thing\">Material-<\/span> and resource allocation planning in order to be able to estimate the consequences of any change (new orders, postponement of deadlines, change in available capacity material deliveries or orders).<\/p>\n<h3>Solution approach<\/h3>\n<p>The aim must be to ensure the timely completion of the <span id=\"urn:local-text-annotation-7m3rlvn7pzd3cbfdinh12j4dk360bvwd\" class=\"textannotation disambiguated wl-thing\">Locomotive<\/span> to be able to plan. The aforementioned backlogs, which inevitably arise in the operating business, must be recalculated at any time for the future and firmly incorporated into the advance<span id=\"urn:local-text-annotation-j3f4deh4waq45aiv5ld7k4c7nd8ssyn3\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> be integrated.<\/p>\n<p>As a result, you get a statement about the production status of an <span id=\"urn:local-text-annotation-09x0sbu2w5u7niu3ccy1xmd2cb5aai6s\" class=\"textannotation disambiguated wl-thing\">Locomotive<\/span>. Usually, the safety and float times that are required for the initial scheduling of a network or for the <span id=\"urn:local-text-annotation-wf4fb7cxnllbs9xlwhpee5c72ueerndb\" class=\"textannotation disambiguated wl-thing\">MRP<\/span>-run are taken into account, reduced.<\/p>\n<p>This reduction is not made across the board, but by finite <span id=\"urn:local-text-annotation-mljsak6vz1my7506s9lozhx2dcmminbf\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> of the individual workstations, taking into account the dependencies of the individual <span id=\"urn:local-text-annotation-ygdafn4jg7c6ma8jichhr4hdbvj9hm8p\" class=\"textannotation disambiguated wl-thing\">Components<\/span> to each other. However, this is only possible if a software tool is available that transparently displays the relationships in the order network and enables the desired finite scheduling.<\/p>\n<p>Modern <span id=\"urn:local-text-annotation-4oo3lg63hah1jkemrb1ng8nqdpn6y1ph\" class=\"textannotation disambiguated wl-thing\">APS<\/span>-systems meet the requirement of simultaneous <span id=\"urn:local-text-annotation-bk3f3ugi0sissl52bs58c6z1l0ni5efb\" class=\"textannotation disambiguated wl-thing\">Material-<\/span> and capacity planning and are in principle suitable for fulfilling the tasks outlined here. However, it must be mentioned restrictively that only a few systems are currently capable of processing the complex interrelationships in a mixed customer-oriented and customer-anonymous order network.<\/p>\n<p><span id=\"urn:local-text-annotation-486gkigxu7nnevkub5pzmesm1cp38mvi\" class=\"textannotation disambiguated wl-organization\">Vossloh<\/span> Locomotives has decided to use OR Soft's Enterprise Workbench. The decisive advantage of this solution is the complete integration with SAP ERP, especially its PP modules, <span id=\"urn:local-text-annotation-oe5nl4xk3y1a6knt1m69w67t86j03rc5\" class=\"textannotation disambiguated wl-thing\">PS<\/span>, PM. The OR Soft system does not have its own master and transaction data.<\/p>\n<p>All <span id=\"urn:local-text-annotation-pwim0oi6oweifpf8ar1hcngzd888ggci\" class=\"textannotation disambiguated wl-thing\">Data<\/span> are made from the <span id=\"urn:local-text-annotation-78mymvkxm1a3ubqje4diqvlymuvcfy57\" class=\"textannotation disambiguated wl-thing\">ERP<\/span> extracts the results in the form of planned orders and production orders, purchase requisitions, network activities or WBS elements in <span id=\"urn:local-text-annotation-sbwqv0zzh0namb1pgq9x3iww8iw49y53\" class=\"textannotation disambiguated wl-organization\">SAP<\/span> written. As a result, it is not necessary to maintain separate master data, establish interfaces or learn new terminology. As an additional benefit, this means that the operation of the <span id=\"urn:local-text-annotation-1lemcnriz2exuc3wn61h2274io82c7rp\" class=\"textannotation disambiguated wl-thing\">ERP<\/span> simplified with the help of an intuitive, graphical interface.<\/p>\n<p>Thanks to the 64-bit<span id=\"urn:local-text-annotation-ygdi2hm9c2cu838eouxbhwy3c6iny7dd\" class=\"textannotation disambiguated wl-thing\">Technology<\/span> of the <span id=\"urn:local-text-annotation-57tvgwq6kt3fh9njf9m4vgu3o5hbcjct\" class=\"textannotation disambiguated wl-organization\">Microsoft<\/span>-There are no technical limits to the amount of data that can be processed with the Enterprise Workbench operating system. The Enterprise Workbench is usually installed locally on a PC; corresponding computers with 8, 16 or more GB of main memory are available on the market at low cost.<\/p>\n<p>The Enterprise Workbench interface is accessed via a browser. There, all networks or all networks under construction are displayed. <span id=\"urn:local-text-annotation-7vl0ara7ii4xcqt3gcw2saj54jup315m\" class=\"textannotation disambiguated wl-thing\">Locomotives<\/span> is displayed. Three icons in the right area provide information about the current status of the <span id=\"urn:local-text-annotation-z9srh77scfny8081wdbddscjdrmfnnid\" class=\"textannotation disambiguated wl-thing\">Locomotive<\/span> in the system:<\/p>\n<ul>\n<li>Scheduling conflicts: incorrect chronological arrangement of operations or <span id=\"urn:local-text-annotation-dq8sh1jpuzq658ozcq4dcsva6xzgphvb\" class=\"textannotation disambiguated wl-thing\">Production orders<\/span> in a production chain<\/li>\n<li>Capacity conflicts: an order has a capacity conflict if, for at least one of its operations, the respective work center is overloaded for the duration of the operation on at least one day in total.<\/li>\n<li>Availability check for purchased parts: In the event of non-availability, the display additionally distinguishes whether the part in question can be procured within the stored planned delivery time or not.<\/li>\n<\/ul>\n<p>It should be noted that not only <span id=\"urn:local-text-annotation-0rgg5tb3k7mp54b8ga0zainqob8wh6lh\" class=\"textannotation disambiguated wl-thing\">Production orders<\/span> and network activities, but also planned orders (linked to the information of routings and bills of material) can be included in the calculation of conflicts.<\/p>\n<p>The expandable tree browser contains all assigned data elements to a network including the information about the temporal position.<\/p>\n<p>If the assigned data element is a plan element or a <span id=\"urn:local-text-annotation-wx4ugamwd2qcsxrofr69squriz3p6zxh\" class=\"textannotation disambiguated wl-thing\">Production order<\/span>, you can tell by the icons whether he has a 1:1 mapping to the <span id=\"urn:local-text-annotation-xk5uz7i3f3dgwzrj0nx51r3uv5zpj89h\" class=\"textannotation disambiguated wl-thing\">Demand creator<\/span> has or whether several <span id=\"urn:local-text-annotation-rcyy7uu2skm9ulgzaalj9avkir8uvjam\" class=\"textannotation disambiguated wl-thing\">Demand creator<\/span> be covered. This connection results from the dynamic allocation of the customer-anonymous <span id=\"urn:local-text-annotation-du7h4oori1jhkmtfwh169nnc02d6u0z3\" class=\"textannotation disambiguated wl-thing\">Production<\/span> with the \"first come - first served\" principle.<\/p>\n<p>The bar graph can be interpreted as follows:<\/p>\n<ul>\n<li>For all mesh elements, the time between corner start and corner end is shown as a thin blue bar<\/li>\n<li>The background of this bar is displayed in green or red according to the time schedule position<\/li>\n<li>A green background signals the permissible shift period without violating time dependencies to the predecessor or successor<\/li>\n<li>The red background indicates that at least one temporal relationship to the predecessor or successor is in conflict. Via a context menu, it is possible to have the system correct the temporal position of the order or the operation (as far as still feasible in terms of time). The system contains a number of other information options and functionalities - but describing them here would exceed the scope of this manual. <span id=\"urn:local-text-annotation-pracam61o7gi76z8mavpbaig6obqnb69\" class=\"textannotation disambiguated wl-thing\">Frame<\/span> burst.<\/li>\n<\/ul>\n<h3>Summary<\/h3>\n<p>An add-on for the modules PP and <span id=\"urn:local-text-annotation-du123m36onhlis7e6fvyesow9jnzsiav\" class=\"textannotation disambiguated wl-thing\">PS<\/span> supports the <span id=\"urn:local-text-annotation-80srrpcd4gjo1d3028x8oib80lfisn4w\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> competing order networks. It thus enables the user to switch from a reactive control in work preparation to a proactive one. <span id=\"urn:local-text-annotation-hoxgmqrhyunu4s4kflm9ri9w4l503u1u\" class=\"textannotation disambiguated wl-thing\">Planning<\/span> transition.<\/p>\n<p>This gives rise to business potential, in particular through assured adherence to deadlines, smoothening of production and reduction of inventories.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>The SAP ERP modules PS and PP are used to map the data model in the manufacture of locomotives. In addition, methods are used to obtain an overview and for automatic planning. An Advanced Planning and Scheduling System (APS) fulfills this need.<\/p>","protected":false},"author":17,"featured_media":1528,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"pmpro_default_level":"","footnotes":""},"categories":[5,1464],"tags":[73,134,111,135,140,138],"coauthors":[22154],"class_list":["post-244","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-it-management","category-mag1308","tag-erp","tag-fertigung","tag-infrastruktur","tag-planung","tag-ps","tag-sap-erp","pmpro-has-access"],"acf":[],"featured_image_urls_v2":{"full":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"thumbnail":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-150x150.jpg",150,150,true],"medium":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",400,252,false],"medium_large":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-768x485.jpg",768,485,true],"large":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"image-100":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-100x63.jpg",100,63,true],"image-480":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-480x303.jpg",480,303,true],"image-640":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-640x404.jpg",640,404,true],"image-720":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-720x454.jpg",720,454,true],"image-960":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-960x606.jpg",960,606,true],"image-1168":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"image-1440":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"image-1920":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"1536x1536":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"2048x2048":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"trp-custom-language-flag":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",18,12,false],"bricks_large_16x9":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"bricks_large":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"bricks_large_square":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",1000,631,false],"bricks_medium":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",600,379,false],"bricks_medium_square":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY.jpg",600,379,false],"profile_24":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-24x24.jpg",24,24,true],"profile_48":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-48x48.jpg",48,48,true],"profile_96":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-96x96.jpg",96,96,true],"profile_150":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-150x150.jpg",150,150,true],"profile_300":["https:\/\/e3mag.com\/wp-content\/uploads\/2013\/08\/Redaktionell-ONLY-300x300.jpg",300,300,true]},"post_excerpt_stackable_v2":"<p>Um bei der Herstellung von Lokomotiven das Datenmodell abzubilden, werden die SAP-ERP-Module PS und PP genutzt. Erg\u00e4nzend kommen Methoden zur \u00dcbersichtsgewinnung und zur automatischen Planung zum Einsatz. Ein Advanced Planning and Scheduling System (APS) erf\u00fcllt diesen Wunsch.<\/p>\n","category_list_v2":"<a href=\"https:\/\/e3mag.com\/en\/category\/it-management\/\" rel=\"category tag\">IT-Management<\/a>, <a href=\"https:\/\/e3mag.com\/en\/category\/mag1308\/\" rel=\"category tag\">MAG 13-08<\/a>","author_info_v2":{"name":"Hartmut Friedrich, OR Soft J\u00e4nicke","url":"https:\/\/e3mag.com\/en\/author\/hartmut-friedrich\/"},"comments_num_v2":"0 comments","_links":{"self":[{"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/posts\/244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/comments?post=244"}],"version-history":[{"count":0,"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/posts\/244\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/media\/1528"}],"wp:attachment":[{"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/media?parent=244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/categories?post=244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/tags?post=244"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/e3mag.com\/en\/wp-json\/wp\/v2\/coauthors?post=244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}